Pavement Crack Sealing Work Underway Across the City
Peterborough, ON – Pavement crack sealing work is underway at various locations across the City. Crews will be routing and sealing cracks in the asphalt pavement surface on several streets. The work is expected to be ongoing until the fall of 2026.
Pavement crack sealing is completed annually and helps to extend the life of the road by preventing infiltration of water into the asphalt pavement surface and the structure below the road.
No road closures are expected during this work; however, locations will experience short delays with flagging operations and lane reductions in the work areas where required.
Pavement crack sealing is expected to take place at several locations, or road sections, throughout the City.
For more information and updates, visit peterborough.ca/roadwork.
Contact Us
City Hall
500 George St. N.
Peterborough, ON
K9H 3R9
Phone: 705-742-7777
Toll Free: 1-855-738-3755
Email Us